Case Studies

Malaysia CB100 Bailey bridge

30m CB100 Bailey Bridge for Temporary Passage of Mountain Roads in Malaysia

The project is a CB100 temporary Bailey bridge designed by AGICO for Malaysian users. The total length of the bridge is 30.48 meters, the width of the single-lane is 3.15 meters.

60m CB300 Bailey Bridge Construction in Columbia

Columbia 60m Single-Span CB300 Prefabricated Bailey Bridge

This project is a Bailey bridge solution designed by the Bailey bridge company AGICO for Colombian customers. The Bailey bridge construction site is a mountainous area, with a single-span design with no bridge piers in the middle.

117m Panama CB450 Permanent Steel Bridge Project

117m Panama CB450 Permanent Steel Bridge Project

117m CB450 (Deta Bridge) permanent bridge solution developed by AGICO for Panamanian users. The solution includes CB450 Bailey bridge design drawings, basic parameters of the bridge, bridge components.

Pakistan modular steel bridge

Pakistan Modular Steel Bridge for Permanent Use

This modular steel bridge was built over a city river in Pakistan for the permanent passage for residents on both sides of the strait. According to the customer’s needs, we designed a modular steel bridge with a span of 60 meters.

Scroll to Top